<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>NSSC on EnergyNote</title><link>https://energynote.kr/en/tags/nssc/</link><description>Recent content in NSSC on EnergyNote</description><generator>Hugo</generator><language>en-US</language><lastBuildDate>Thu, 08 Oct 2026 09:00:00 +0900</lastBuildDate><atom:link href="https://energynote.kr/en/tags/nssc/index.xml" rel="self" type="application/rss+xml"/><item><title>Why four Korean reactors are idle: expired licenses, a twice-deferred accident plan, and Wolsong 2 on November 1</title><link>https://energynote.kr/en/posts/idle-reactors-license-bottleneck/</link><pubDate>Thu, 08 Oct 2026 09:00:00 +0900</pubDate><guid>https://energynote.kr/en/posts/idle-reactors-license-bottleneck/</guid><description>&lt;p&gt;KRW 1,891.9 billion, about $1.4 billion. That is the value of the electricity four Korean reactors could not sell between their license expiry dates and September 22, 2026, according to the office of Rep. Hwang Jung-a, working from data supplied by Korea Hydro &amp;amp; Nuclear Power (KHNP), the state utility that operates every Korean reactor, and it counts foregone sales, not cash that left anyone&amp;rsquo;s account.&lt;/p&gt;</description></item><item><title>i-SMR licensing tracker, October 2026: where Korea's standard design approval stands</title><link>https://energynote.kr/en/posts/ismr-licensing-tracker-2026-10/</link><pubDate>Sat, 03 Oct 2026 09:00:00 +0900</pubDate><guid>https://energynote.kr/en/posts/ismr-licensing-tracker-2026-10/</guid><description>&lt;p&gt;Seven months. That is how long Korea&amp;rsquo;s first small modular reactor design has been in front of its regulator, and the next two dated deadlines both belong to the developer, not the regulator.&lt;/p&gt;&#10;&lt;p&gt;This is a dated status check, not an explainer. The background on the i-SMR, the institutions and the program&amp;rsquo;s wider setting is in &lt;a href="https://energynote.kr/en/posts/korean-smr-ismr-status/"&gt;our baseline post on Korea&amp;rsquo;s SMR program&lt;/a&gt;. Everything below is as of October 2, 2026, and where I could not confirm something, I say so.&lt;/p&gt;</description></item><item><title>How Korea's reactors are designed for earthquakes and tsunamis: the numbers, site by site</title><link>https://energynote.kr/en/posts/korea-reactor-seismic-design/</link><pubDate>Wed, 30 Sep 2026 09:00:00 +0900</pubDate><guid>https://energynote.kr/en/posts/korea-reactor-seismic-design/</guid><description>&lt;p&gt;At 8:32 p.m. on September 12, 2016, a magnitude-5.8 earthquake, the strongest ever instrumentally measured in South Korea, struck about 27 kilometers from the Wolsong nuclear site outside Gyeongju, and instruments there recorded shaking strong enough to trigger a manual reactor shutdown. Four units went off line as a precaution; none was damaged, and the recorded shaking stayed below the plant&amp;rsquo;s design limit. It was still the closest a Korean reactor site has come to testing the number engineers had written into its blueprints decades earlier.&lt;/p&gt;</description></item><item><title>How Korea decides whether a 40-year-old reactor keeps running: the continued-operation process, step by step</title><link>https://energynote.kr/en/posts/korea-reactor-license-renewal/</link><pubDate>Sun, 13 Sep 2026 13:51:00 +0900</pubDate><guid>https://energynote.kr/en/posts/korea-reactor-license-renewal/</guid><description>&lt;p&gt;On September 11, 2026, Hanbit unit 2 on Korea&amp;rsquo;s west coast reached the end of its 40-year operating license and stopped. Nothing had broken. The unit joined Kori 3, Kori 4 and its sister Hanbit 1 in a queue of reactors that are legally &amp;ldquo;operating&amp;rdquo; but cannot generate until the regulator says so, and that morning the regulator considered the first item in their file and put it off to a later meeting.&lt;/p&gt;</description></item><item><title>How a nuclear reactor gets licensed in Korea: from site to standard design approval to first power</title><link>https://energynote.kr/en/posts/korea-nuclear-licensing-process/</link><pubDate>Sun, 13 Sep 2026 13:47:00 +0900</pubDate><guid>https://energynote.kr/en/posts/korea-nuclear-licensing-process/</guid><description>&lt;p&gt;Suppose you read that Korea &amp;ldquo;approved&amp;rdquo; a reactor this week. Five different things could have happened: a ministry approved a site plan, the regulator accepted a design, it permitted construction, it licensed operation, or it cleared a unit to restart after a trip. Korean headlines use one verb for all five.&lt;/p&gt;</description></item></channel></rss>