<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Korean Reactor Design on EnergyNote</title><link>https://energynote.kr/en/tags/korean-reactor-design/</link><description>Recent content in Korean Reactor Design on EnergyNote</description><generator>Hugo</generator><language>en-US</language><lastBuildDate>Thu, 10 Sep 2026 15:18:00 +0900</lastBuildDate><atom:link href="https://energynote.kr/en/tags/korean-reactor-design/index.xml" rel="self" type="application/rss+xml"/><item><title>What is the APR1400? Korea's export reactor explained — design, safety systems, track record and cost</title><link>https://energynote.kr/en/posts/apr1400-explained/</link><pubDate>Thu, 10 Sep 2026 15:18:00 +0900</pubDate><guid>https://energynote.kr/en/posts/apr1400-explained/</guid><description>&lt;p&gt;Eight APR1400 reactors are selling electricity as of September 2026, four in South Korea and four at Barakah in the United Arab Emirates. A ninth, Saeul 3, is in commissioning, three more are under construction in Korea, and two units of its 1,000 MW-class derivative are under contract in Czechia. By our count it is the only large reactor since 2010 exported to a newcomer country and completed by a vendor outside China and Russia, and also a design whose first units took roughly twice as long to build as planned.&lt;/p&gt;</description></item></channel></rss>