<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Korea on EnergyNote</title><link>https://energynote.kr/en/tags/korea/</link><description>Recent content in Korea on EnergyNote</description><generator>Hugo</generator><language>en-US</language><lastBuildDate>Thu, 03 Sep 2026 12:30:00 +0900</lastBuildDate><atom:link href="https://energynote.kr/en/tags/korea/index.xml" rel="self" type="application/rss+xml"/><item><title>Designing for 100,000 years: the world's deep repositories, from Onkalo to Korea's Gyeongju</title><link>https://energynote.kr/en/posts/world-repositories/</link><pubDate>Thu, 03 Sep 2026 12:30:00 +0900</pubDate><guid>https://energynote.kr/en/posts/world-repositories/</guid><description>&lt;p&gt;The Great Pyramid of Giza has stood for about 4,600 years, which makes it one of the oldest large structures humans have built. A handful of countries are now building facilities that must stay safe for &lt;strong&gt;more than 100,000 years&lt;/strong&gt;: deep geological repositories for high-level radioactive waste, mostly spent nuclear fuel. Engineering a guarantee longer than recorded history is hard enough.&lt;/p&gt;</description></item><item><title>Korea is asking whether to build more reactors — what the September 2026 public deliberation is really about</title><link>https://energynote.kr/en/posts/new-reactor-public-debate/</link><pubDate>Thu, 03 Sep 2026 12:30:00 +0900</pubDate><guid>https://energynote.kr/en/posts/new-reactor-public-debate/</guid><description>&lt;p&gt;On August 20, 2026, in a National Assembly office building in Seoul, the committee drafting Korea&amp;rsquo;s next 15-year power plan put a new number on the table. Peak electricity demand in 2040 is now forecast at &lt;strong&gt;158.4–165.0 GW&lt;/strong&gt;, up from the 131.8–138.2 GW the same committee had forecast in April. The gap is about 27 GW, the output of nineteen large reactors of 1.4 GW each, and it appeared in four months.&lt;/p&gt;</description></item><item><title>Korea's SMR program in 2026: where i-SMR really stands, and what the new SMR Act changes</title><link>https://energynote.kr/en/posts/korean-smr-ismr-status/</link><pubDate>Thu, 03 Sep 2026 12:30:00 +0900</pubDate><guid>https://energynote.kr/en/posts/korean-smr-ismr-status/</guid><description>&lt;p&gt;On September 1, 2026, Seoul National University&amp;rsquo;s Nuclear Policy Center and GS Energy, a private Korean power company, hosted a policy forum on building a &amp;ldquo;private-sector-led SMR business model.&amp;rdquo; SK Innovation presented a Korea–US cooperation model built around TerraPower. POSCO Holdings said it wants small modular reactors to supply the 1.7 GW of electricity its hydrogen-based steelmaking will need.&lt;/p&gt;</description></item></channel></rss>