<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>APR1400 on EnergyNote</title><link>https://energynote.kr/en/tags/apr1400/</link><description>Recent content in APR1400 on EnergyNote</description><generator>Hugo</generator><language>en-US</language><lastBuildDate>Fri, 02 Oct 2026 23:02:00 +0900</lastBuildDate><atom:link href="https://energynote.kr/en/tags/apr1400/index.xml" rel="self" type="application/rss+xml"/><item><title>Will a Korean reactor be built in America? What the US-Korea nuclear package says, and what it does not</title><link>https://energynote.kr/en/posts/us-korea-nuclear-package/</link><pubDate>Fri, 02 Oct 2026 23:02:00 +0900</pubDate><guid>https://energynote.kr/en/posts/us-korea-nuclear-package/</guid><description>&lt;p&gt;Eight reactors and up to $120 billion make the headline. The number that matters more is zero: as of October 2, 2026, no specific site, owner, construction contract or power buyer has been confirmed for any of them. What exists is a framework, and Korea&amp;rsquo;s own industry minister has said it does not mean the projects proceed immediately.&lt;/p&gt;</description></item><item><title>Barakah at five years: the UAE's Korean-built reactors, by the numbers</title><link>https://energynote.kr/en/posts/barakah-five-years/</link><pubDate>Tue, 22 Sep 2026 21:05:00 +0900</pubDate><guid>https://energynote.kr/en/posts/barakah-five-years/</guid><description>&lt;p&gt;Drive 53 km west of Ruwais on the UAE&amp;rsquo;s Gulf coast and four reactor domes rise out of the desert together. All four have been generating power since September 2024. The first of them, Unit 1, passed its fifth anniversary of commercial operation in April 2026, which is the anchor date for this scorecard. What follows checks the plant&amp;rsquo;s own numbers, and its critics&amp;rsquo; numbers, against primary sources.&lt;/p&gt;</description></item><item><title>What is the APR1400? Korea's export reactor explained — design, safety systems, track record and cost</title><link>https://energynote.kr/en/posts/apr1400-explained/</link><pubDate>Thu, 10 Sep 2026 15:18:00 +0900</pubDate><guid>https://energynote.kr/en/posts/apr1400-explained/</guid><description>&lt;p&gt;Eight APR1400 reactors are selling electricity as of September 2026, four in South Korea and four at Barakah in the United Arab Emirates. A ninth, Saeul 3, is in commissioning, three more are under construction in Korea, and two units of its 1,000 MW-class derivative are under contract in Czechia. By our count it is the only large reactor since 2010 exported to a newcomer country and completed by a vendor outside China and Russia, and also a design whose first units took roughly twice as long to build as planned.&lt;/p&gt;</description></item><item><title>Korea's nuclear reactor fleet, site by site — every unit, its type, age and status (September 2026)</title><link>https://energynote.kr/en/posts/korea-reactor-fleet-map/</link><pubDate>Sun, 06 Sep 2026 14:44:00 +0900</pubDate><guid>https://energynote.kr/en/posts/korea-reactor-fleet-map/</guid><description>&lt;p&gt;On September 11, 2026, the 40-year operating license of Hanbit unit 2, a Westinghouse reactor on Korea&amp;rsquo;s southwest coast, runs out. The unit stopped that day and joined two Kori units and its sister Hanbit 1 in a queue for license renewal, without leaving the official count of 26 &amp;ldquo;operating&amp;rdquo; reactors. A list of Korean reactors has to carry that kind of detail, and most lists in English do not.&lt;/p&gt;</description></item><item><title>Korea's nuclear exports, project by project — Barakah, Dukovany and what comes next</title><link>https://energynote.kr/en/posts/korea-nuclear-exports/</link><pubDate>Sat, 05 Sep 2026 23:56:00 +0900</pubDate><guid>https://energynote.kr/en/posts/korea-nuclear-exports/</guid><description>&lt;p&gt;Sixteen months. That is how long the European Commission spent reviewing the Dukovany contract before deciding, on June 5, 2026, not to open an in-depth investigation into Korea Hydro &amp;amp; Nuclear Power (KHNP) under the EU&amp;rsquo;s Foreign Subsidies Regulation. The decision left Korea&amp;rsquo;s second nuclear export where its first, Barakah, stood a decade and a half earlier: contracted, financed and waiting for concrete.&lt;/p&gt;</description></item></channel></rss>